SCOPE
- General Contractor: Cadence McShane
- 650,000 square feet, consisting of three 4-Story Office Build-outs
- 590,000 square foot 7-Story Parking Garage
- 300,000 square foot 6-story Parking Garage
- Related Site-work (Rock Excavation) over 14,000’ from 6’ to 16’ deep
- (3) 4,000A 480V Distribution
- (7) 480V Bus Risers @ 4 Stories
- (1) 1 MW Generator Stand-by and Life-Safety Distribution
- (2) 500 kw Generators Stand-by and Life-Safety Distribution
- (1) 305 kw Generators Stand-by and Life-Safety Distribution
- 3000A 480V Paralleling Gear
- 9,000 LED Dimmable and Addressable light fixtures with Daylight Harvesting
- Addressable Lighting Controls
- DMX color-changing Lights
- Lutron Motorized Shade Control with Light Integration
- (6) 300kVA UPS – 2N Distribution
- Fire Alarm, Voice Evacuation, and Pre-action Systems
- Voice / Data / AV / Security / Sound Masking / BMS Systems
- Lightning Protection Systems
- 10,000 square foot of Theatrical lighting and rigging
FEATURES / MILESTONES
- 165,000 Man/Hours with ZERO Safety Recordable Incidents
- 65 Man Crew
- 30-Month Schedule
- GMAX Billing (Under Budget)
- GMP determined at SD Level
- Extensive Value Engineering needed for Budget Compliance
- Design / Assist, BIM Coordination
- Extensive Change Management-Maintained Original Schedule
- LEAN Construction Means and Methods