SCOPE
- General Contractor: SpawGlass
- 460,000 square foot 5-Story Office Build-out
- 550,000 square foot 8-Story Parking Garage
- Related Site-work (Rock Excavation)
- (2) 4,000A 480V Distribution
- (16) 480V Bus Risers @ 5 Stories
- (2) 2 MW Generator Stand-by and Life-Safety Distribution
- 3000A 480V Paralleling Gear
- Under-floor Power / Data Systems
- DIRTT Wall Coordination and Integration
- 9,000 LED Dimmable and Addressable light fixtures with Daylight Harvesting
- Addressable Lighting Controls
- DMX color-changing Lights
- Commercial Kitchen / Dining Areas
- Lutron Motorized Shade Control with Light Integration
- (2) 625kVA UPS – 2N Distribution
- Fire Alarm, Voice Evacuation, and Pre-action Systems
- Pre-action and FM200 Systems
- Voice / Data / AV / Security / Sound Masking / Cellular Repeater / BMS Systems
- Lightning Protection Systems
- CPS and AT&T Coordination
FEATURES / MILESTONES
- 245,000 Man/Hours with ZERO Safety Recordable Incidents
- 175 Man Crew
- 14-Month Schedule
- GMAX Billing (Under Budget)
- GMP determined at SD Level
- Extensive Value Engineering needed for Budget Compliance
- Design / Assist, BIM Coordination
- Extensive Change Management-Maintained Original Schedule
- LEAN Construction Means and Methods