Frost

SCOPE

  • General Contractor: SpawGlass
  • 460,000 square foot 5-Story Office Build-out
  • 550,000 square foot 8-Story Parking Garage
  • Related Site-work (Rock Excavation)
  • (2) 4,000A 480V Distribution
  • (16) 480V Bus Risers @ 5 Stories
  • (2) 2 MW Generator Stand-by and Life-Safety Distribution
  • 3000A 480V Paralleling Gear
  • Under-floor Power / Data Systems
  • DIRTT Wall Coordination and Integration
  • 9,000 LED Dimmable and Addressable light fixtures with Daylight Harvesting
  • Addressable Lighting Controls
  • DMX color-changing Lights
  • Commercial Kitchen / Dining Areas
  • Lutron Motorized Shade Control with Light Integration
  • (2) 625kVA UPS – 2N Distribution
  • Fire Alarm, Voice Evacuation, and Pre-action Systems
  • Pre-action and FM200 Systems
  • Voice / Data / AV / Security / Sound Masking / Cellular Repeater / BMS Systems
  • Lightning Protection Systems
  • CPS and AT&T Coordination

FEATURES / MILESTONES            

  • 245,000 Man/Hours with ZERO Safety Recordable Incidents
  • 175 Man Crew
  • 14-Month Schedule
  • GMAX Billing (Under Budget)
  • GMP determined at SD Level
  • Extensive Value Engineering needed for Budget Compliance
  • Design / Assist, BIM Coordination
  • Extensive Change Management-Maintained Original Schedule
  • LEAN Construction Means and Methods