SCOPE
- General Contractor: RC Page Construction
- 850,000 square foot 1-Story Distribution Facility
- Related Site-work with Guard House
- (1) 3,000A 480V Distribution
- (1) 300 KW Generator Stand-by and Life-Safety Distribution
- Under-slab Power / Communications Duct-banks
- In slab-floor Power / Data Systems
- Dock Leveler Power / Controls
- Motorized Door Power / Controls
- LED Dimmable light fixtures with Daylight Harvesting
- Addressable Lighting Controls
- DMX color-changing Lights
- Fire Alarm, Voice Evacuation, and Pre-action Systems
- CPS and AT&T Coordination
FEATURES / MILESTONES
- 45,000 Man/Hours with ZERO Safety Recordable Incidents
- 55 Man Crew
- 6-Month Schedule
- GMP determined at SD Level
- Extensive Value Engineering needed for Budget Compliance
- Design / Assist, BIM Coordination
- Extensive Change Management-Maintained Original Schedule
- LEAN Construction Means and Methods