Carrier Corporation | San Antonio

SCOPE

  • General Contractor: RC Page Construction
  • 850,000 square foot 1-Story Distribution Facility
  • Related Site-work with Guard House
  • (1) 3,000A 480V Distribution
  • (1) 300 KW Generator Stand-by and Life-Safety Distribution
  • Under-slab Power / Communications Duct-banks
  • In slab-floor Power / Data Systems
  • Dock Leveler Power / Controls
  • Motorized Door Power / Controls
  • LED Dimmable light fixtures with Daylight Harvesting
  • Addressable Lighting Controls
  • DMX color-changing Lights
  • Fire Alarm, Voice Evacuation, and Pre-action Systems
  • CPS and AT&T Coordination

FEATURES / MILESTONES

  • 45,000 Man/Hours with ZERO Safety Recordable Incidents
  • 55 Man Crew
  • 6-Month Schedule
  • GMP determined at SD Level
  • Extensive Value Engineering needed for Budget Compliance
  • Design / Assist, BIM Coordination
  • Extensive Change Management-Maintained Original Schedule
  • LEAN Construction Means and Methods